RAIN WATER HARVESTING TECHNIQUES
There are two main techniques of rain water harvestings-
- Storage of rainwater on surface for future use.
- Recharge to ground water.
The storage of rain water on surface is a traditional techniques and structures used were underground tanks, ponds, check dams, weirs etc
Recharge to ground water is a new concept of rain water harvesting and the structures generally used are :-
- Pits :- Recharge pits are constructed for recharging the shallow aquifer. These are constructed 1 to 2 m, wide and to 3 m. deep which are back filled with boulders, gravels, coarse sand.
- Trenches:- These are constructed when the permeable stram is available at shallow depth. Trench may be 0.5 to 1 m. wide, 1 to 1.5m. deep and 10 to 20 m. long depending up availability of water. These are back filled with filter materials.
- Dug wells:- Existing dug wells may be utilised as recharge structure and water should pass through filter media before putting into dug well.
- Hand pumps :- The existing hand pumps may be used for recharging the shallow/deep aquifers, if the availability of water is limited. Water should pass through filter media before diverting it into hand pumps.
- Recharge wells :- Recharge wells of 100 to 300 mm. diameter are generally constructed for recharging the deeper aquifers and water is passed through filter media to avoid choking of recharge wells.
- Recharge Shafts :- For recharging the shallow aquifer which are located below clayey surface, recharge shafts of 0.5 to 3 m. diameter and 10 to 15 m. deep are constructed and back filled with boulders, gravels & coarse sand
- Lateral shafts with bore wells :- For recharging the upper as well as deeper aquifers lateral shafts of 1.5 to 2 m. wide & 10 to 30 m. long depending upon availability of water with one or two bore wells are constructed. The lateral shafts is back filled with boulders, gravels & coarse sand.
- Spreading techniques :- When permeable strata starts from top then this technique is used. Spread the water in streams/Nalas by
making check dams, nala bunds, cement plugs, gabion structures or a percolation pond may be constructed.