Sunday 2 March 2014

Now we will talk about the rest of the process in this post.

First Flush Pipe
  • Debris, dust & dirt collect on the roof during non rainy periods when the first rain arrive. 
  • A first flush system arrangement is made to avoid the entering unwanted material into the Filter media & storage tank.
  • This is a simple manually operated arrangement or semi-automatic system with a valve below the ‘T’ junction. --------------------------------------------------------------------------------------------------------------------
Filter Unit 
  • The filter unit is a container or chamber filled with filter media such as coarse sand, charcoal, coconut fibre, pebbles & gravels to remove the debris & dirt from water that enters the tank.
  • The filter unit is placed over the storage tank or separately. 
  • It may be of Ferro cement filter unit, Aluminium, Cement rings or Plastic bucket etc.   
-----------------------------------------------------------------------------------------------------------------------------------
Storage Tank
  • It is used to store the water that is collected from the roof through filter.
  • For small scale water storage plastic buckets, jerry cans, clay or cement jars, ceramic jars, drums may be used. 
  • For larger quantities of water, the system will require a bigger tank with cylindrical or rectangular or square in shape constructed with Ferro cement or cement rings or plain cement concrete or reinforced cement concrete or brick or stone etc. 
  • The storage tank is provided with a cover on the top to avoid the contamination of water from external sources. 
  • The storage tank is provided with pipe fixtures at appropriate places to draw the water to clean the tank & to dispose of extra water. 
 Size of Storage Tank is based on:-
  • No. of person in the House hold
  • Per capita water requirement
  • No. of days for which water is required

No comments:

Post a Comment